Gombe, Nigeria regional water supply project
Services Rendered
Design and construction of 1000mm, 800mm, 600mm, 400mm ductile iron mains and 300mm and 200mm distribution system totaling approximately 140km. Design and construction of 100 Mld water treatment plant with iron removal capability, two pumping stations including installation of pumps and commissioning, 1 x 50 million litre and 2 x 25 million litre treated water reservoirs. Break-pressure tanks, overhead tanks for distribution water supply, ancillary structures, housing colony (30 houses) for operating staff, training of staff.