Design and construction of gas supply to Ikeja industrial consumers at Lagos (27 Km)
Services Rendered
Design and installation of 14", 12" and 8" high-pressure pipelines in heavily congested industrial area, with pressure reduction and metering stations. Supply of materials (excluding owner-supplied pipe), construction, commissioning, training of operators.